MANGLISI

Water Supply System

🏗️Manglisi Water Supply System Enhancement Project

Project Overview

Project Cost: 11,500,000.00 GEL
Contractors: Invest Group and COBRA INSTALACIONES Y SERVICIOS, S.A. branch Georgia
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Manglisi, Tetritskaro municipality, Georgia

Introduction

Welcome to the Manglisi Water Supply System Enhancement project, a collaborative effort by Invest Group and COBRA INSTALACIONES Y SERVICIOS, S.A. branch Georgia. The project, commissioned by UWSCG, is committed to delivering a comprehensive and meticulously planned water supply system in Manglisi Township, situated at 1200 meters above sea level, 45 kilometers from Tetritskaro.

Project Highlights

Location

🏫 Township: Manglisi, Tetritskaro municipality, Georgia
📍 Geographic Details: Located at 1200 meters above sea level, 45 kilometers from Tetritskaro.

Key Components

Water Supply Networks:

    • Implementation of resilient water supply networks, intricately designed to ensure optimal performance.
    • Inclusion of highways for efficient access and maintenance.
    • Development of headworks with a focus on effective water management.

Pumping Station and Dewatering Systems:

    • Construction of a pumping station tailored for efficient water distribution.
    • Integration of dewatering systems to manage water levels effectively.

Reservoir and Pressure Tower:

    • Development of a detailed reservoir project, incorporating necessary facilities for ventilation and control.
    • Consideration of a pressure tower if required to maintain optimal pressure levels.

House Connections and Internal Wiring:

    • Establishment of reliable house connections for seamless water distribution within buildings.
    • Implementation of internal wiring to facilitate efficient water usage.

Individual Population Metering:

    • Installation of individual population meters, ensuring precise monitoring.
    • Inclusion of all related facilities for a comprehensive metering system.

Crossing of Natural and Artificial Obstacles:

    • Thorough consideration of railway crossings, roads, ravines, rivers, and other natural or artificial obstacles.
    • Integration of DMA water meters and pressure relief (PRV) chambers to address specific project needs.

Operational Cost Determination:

    • Rigorous analysis and determination of operational costs to provide clear insights for sustainable management.

Preparation of Specifications and Cost Estimates:

    • Detailed preparation of specifications and accurate cost estimates to ensure transparency and informed decision-making.

Preparation of Scope of Works:

    • Definition and documentation of the scope of works, outlining the tasks and objectives of the project.

Commitment to Excellence

Our dedication extends beyond project completion; we aspire to deliver a water supply system that stands as a testament to efficiency, sustainability, and reliability. We look forward to contributing to the prosperity and well-being of Manglisi and its residents.