Project Overview
Project Cost: 8,500,000.00 GEL
Contractor: Invest Group
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Bakuriani, Georgia
Introduction
Embark on the journey of revitalizing the Bakuriani resort through the Optimization Works of its water supply system. Our project aims to elevate water flow, enhance operational flexibility, and ensure system reliability. With meticulous planning and innovation, we strive to optimize existing infrastructure and introduce new elements to meet the evolving needs of this esteemed destination.
Project Highlights
Location
🏫 City: Bakuriani, Georgia
📍 Geographic Details: Situated in Borjomi municipality, on the northern slope of the Trialeti ridge, on the bank of the Bakurianiskali River, 1700 meters above sea level, and 180 kilometers from Tbilisi.
Project Components
Main Building Rehabilitation or Construction:
Main Pipe Infrastructure Enhancement:
Sanitary Protection Measures:
Pumping Station Reconstruction:
Reservoir Rehabilitation:
Automatic Control System - SCADA:
Water Treatment Plant Upgrade:
Ventilation System Maintenance:
Trunk Pipeline Establishment:
Switch Nodes and Pipes Integration:
Energy Efficiency Measures:
Exploration of Alternative Options:
Commitment to Excellence
Our commitment goes beyond the conventional, as we remain open to exploring alternative options that promise superior benefits. Every decision is grounded in a robust technical and economic evaluation, ensuring the sustainability and efficiency of the Bakuriani resort water system. We take pride in our dedication to delivering not just a project, but a lasting solution that aligns with the evolving needs of this esteemed destination.