TSALENJIKHA

Water Supply System

🏗️ Tsalenjikha Water Supply System Enhancement Project

Project Overview

Project Cost: 25,000,000.00 GEL
Contractor: Invest Group
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Tsalenjikha, Georgia

Introduction

Embarking on a mission to elevate the water supply system in Tsalenjikha, our project, undertaken by Invest Group for UWSCG, is committed to delivering a comprehensive and sophisticated water supply system. Located in the Samegrelo-Zemo Svaneti region, Tsalenjikha stands as the administrative center of the municipality, 222 meters above sea level, and 100 km from Kutaisi.

Project Highlights

Location

🏫 Town: Tsalenjikha, Georgia
📍 Geographic Details: Administrative center of the Tsalenjikha district in Samegrelo-Zemo Svaneti, 222 meters above sea level, 100 km from Kutaisi.

Key Components

Water Supply Networks:

    • Implementation of resilient water supply networks, intricately designed with corresponding debit accounting and transmission systems.
    • Integration of spare wells for redundancy and uninterrupted water flow.

Highways and Headworks:

    • Inclusion of well-designed highways for seamless access and efficient maintenance.
    • Incorporation of headworks with a focus on optimizing water management.

Pumping Station (for Large Capacities and Diameters):

    • Construction of a pumping station tailored for large capacities and diameters (DN≥250mm).
    • Consideration of electric valves equipped with an advanced automatic control system for precision and reliability.

Deaeration Systems:

    • Incorporation of deaeration systems featuring chlorination, dosing, mixing, and robust safety measures.

Reservoir Project:

    • Development of a detailed reservoir project, inclusive of a ventilation chamber for optimal conditions.
    • Installation of all necessary shut-off valves and flow meters to ensure precise control.

Pressure Tower:

    • Construction of a pressure tower if deemed necessary for maintaining optimal pressure levels.

House Connections and Internal Wiring:

    • Establishment of reliable house connections for seamless water distribution within buildings.
    • Implementation of internal wiring to facilitate efficient water usage.

Individual Population Meters:

    • Installation of individual population meters, with provisions for dimming if required.

Automatic Control System Design - SCADA:

    • Detailed design of an automatic control system, covering various elements such as railway crossings, roads, gullies, rivers, and other natural or artificial obstacles.
    • Restoration of existing treated road surfaces, inclusion of DMA water meters, and pressure unloader (PRV) chambers are integral to the design.

Preparation of Specifications and Cost Estimates:

    • Rigorous preparation of detailed specifications and accurate cost estimates to ensure transparency and informed decision-making.

Preparation of Scope of Works:

    • Definition and documentation of the scope of works, outlining the tasks and objectives of the project.

Construction Organization Project and Plan-Schedule:

    • Development of a construction organization project, accompanied by a corresponding plan-schedule, essential for effective project management.
    • Presentation of the construction organization project and plan-schedule alongside the final project submission.

Executive Drawings After Completion:

    • Post-completion, meticulous preparation of executive drawings in strict accordance with the customer's instructions, ensuring the successful realization of their vision.

Commitment to Excellence

Our dedication extends beyond project completion; we aspire to deliver a water supply system that stands as a testament to efficiency, sustainability, and reliability. We look forward to contributing to the prosperity and well-being of Tsalenjikha and its residents.

Project Diversity

"Discover Our Passion for Creating Timeless and Innovative Designs"

Get in Touch

Building Relationships Through Communication

Tbilisi Office
Gori Office