City of Kaspi Water Supply System Optimization Design â Construction
Project Overview
Project Cost: 31,500,000.00 GEL
Contractor: Invest Group
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Kaspi, Georgia
Introduction
Welcome to the City of Kaspi Water Supply System Optimization project, a comprehensive initiative dedicated to enhancing water supply infrastructure in Kaspi, Georgia. Our commitment is not just to complete a project but to set new standards for efficiency, sustainability, and reliability.
Project Highlights
Location
đŤ City: Kaspi, Georgia
đ Geographic Details: Located on the bank of the Lekhur River, at an elevation of 560 meters above sea level, 48 kilometers from Tbilisi.
Project Components
Water Supply Networks
- Implementation of robust water supply networks with intricate debit accounting and transmission systems.
Highways and Headworks
- Well-designed highways for easy access and efficient maintenance.
- Incorporation of headworks focusing on optimizing water management.
Pumping Station
- Construction of a large-capacity pumping station (DNâĽ250mm).
- Electric valves with an advanced automatic control system for precision and reliability.
Deaeration Systems
- Incorporation of deaeration systems featuring chlorination, dosing, mixing, and robust security measures.
Reservoir Project
- Development of a detailed reservoir project, including a ventilation chamber for optimal conditions.
- Installation of shut-off valves and flow meters for precise control.
Pressure Tower
- Construction of a pressure tower if necessary to maintain optimal pressure levels.
House Connections and Internal Wiring
- Establishment of reliable house connections for seamless water distribution within buildings.
- Implementation of internal wiring to facilitate efficient water usage.
Individual Population Meters (if Necessary)
- Installation of individual population meters, with provisions for naturalization if required.
Automatic Control System Design â SCADA
- Detailed design of an automatic control system covering various elements such as railway crossings, roads, ravines, rivers, and other obstacles.
- Restoration of existing treated road surfaces, DMA water meters, and pressure relief (PRV) chambers.
Preparation of Specifications and Cost Estimates
- Rigorous preparation of detailed specifications and accurate cost estimates for transparency and informed decision-making.
Preparation of Scope of Works
- Definition and documentation of the scope of works, outlining the tasks and objectives of the project.
Project of Sanitary Protection Zones
- Development of a project for sanitary protection zones in strict accordance with Resolution No. 161 of the Government of Georgia dated March 26, 2019, and sanitary rules and norms.
Construction Organization Project and Plan-Schedule
- Development of a construction organization project, including a corresponding plan-schedule crucial for effective project management.
- Presentation of the construction organization project and plan-schedule alongside the final project submission.
Executive Drawings after Completion
- Post-completion preparation of executive drawings meticulously crafted to align with the customer's instructions, ensuring the successful realization of their vision.
Conclusion
Our commitment extends beyond mere completion; we strive to deliver a water supply system that sets benchmarks for efficiency, sustainability, and reliability. We look forward to contributing to the prosperity and well-being of the City of Kaspi and its residents.