Tsalenjikha Water Supply System Enhancement Project
Project Overview
Project Cost: 25,000,000.00 GEL
Contractor: Invest Group
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Tsalenjikha, Georgia
Introduction
Embarking on a mission to elevate the water supply system in Tsalenjikha, our project, undertaken by Invest Group for UWSCG, is committed to delivering a comprehensive and sophisticated water supply system. Located in the Samegrelo-Zemo Svaneti region, Tsalenjikha stands as the administrative center of the municipality, 222 meters above sea level, and 100 km from Kutaisi.
Project Highlights
Location
đŤ Town: Tsalenjikha, Georgia
đ Geographic Details: Administrative center of the Tsalenjikha district in Samegrelo-Zemo Svaneti, 222 meters above sea level, 100 km from Kutaisi.
Key Components
Water Supply Networks:
- Implementation of resilient water supply networks, intricately designed with corresponding debit accounting and transmission systems.
- Integration of spare wells for redundancy and uninterrupted water flow.
Highways and Headworks:
- Inclusion of well-designed highways for seamless access and efficient maintenance.
- Incorporation of headworks with a focus on optimizing water management.
Pumping Station (for Large Capacities and Diameters):
- Construction of a pumping station tailored for large capacities and diameters (DNâĽ250mm).
- Consideration of electric valves equipped with an advanced automatic control system for precision and reliability.
Deaeration Systems:
- Incorporation of deaeration systems featuring chlorination, dosing, mixing, and robust safety measures.
Reservoir Project:
- Development of a detailed reservoir project, inclusive of a ventilation chamber for optimal conditions.
- Installation of all necessary shut-off valves and flow meters to ensure precise control.
Pressure Tower:
- Construction of a pressure tower if deemed necessary for maintaining optimal pressure levels.
House Connections and Internal Wiring:
- Establishment of reliable house connections for seamless water distribution within buildings.
- Implementation of internal wiring to facilitate efficient water usage.
Individual Population Meters:
- Installation of individual population meters, with provisions for dimming if required.
Automatic Control System Design - SCADA:
- Detailed design of an automatic control system, covering various elements such as railway crossings, roads, gullies, rivers, and other natural or artificial obstacles.
- Restoration of existing treated road surfaces, inclusion of DMA water meters, and pressure unloader (PRV) chambers are integral to the design.
Preparation of Specifications and Cost Estimates:
- Rigorous preparation of detailed specifications and accurate cost estimates to ensure transparency and informed decision-making.
Preparation of Scope of Works:
- Definition and documentation of the scope of works, outlining the tasks and objectives of the project.
Construction Organization Project and Plan-Schedule:
- Development of a construction organization project, accompanied by a corresponding plan-schedule, essential for effective project management.
- Presentation of the construction organization project and plan-schedule alongside the final project submission.
Executive Drawings After Completion:
- Post-completion, meticulous preparation of executive drawings in strict accordance with the customer's instructions, ensuring the successful realization of their vision.
Commitment to Excellence
Our dedication extends beyond project completion; we aspire to deliver a water supply system that stands as a testament to efficiency, sustainability, and reliability. We look forward to contributing to the prosperity and well-being of Tsalenjikha and its residents.