Manglisi Water Supply System Enhancement Project
Project Overview
Project Cost: 11,500,000.00 GEL
Contractors: Invest Group and COBRA INSTALACIONES Y SERVICIOS, S.A. branch Georgia
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Manglisi, Tetritskaro municipality, Georgia
Introduction
Welcome to the Manglisi Water Supply System Enhancement project, a collaborative effort by Invest Group and COBRA INSTALACIONES Y SERVICIOS, S.A. branch Georgia. The project, commissioned by UWSCG, is committed to delivering a comprehensive and meticulously planned water supply system in Manglisi Township, situated at 1200 meters above sea level, 45 kilometers from Tetritskaro.
Project Highlights
Location
🏫 Township: Manglisi, Tetritskaro municipality, Georgia
📍 Geographic Details: Located at 1200 meters above sea level, 45 kilometers from Tetritskaro.
Key Components
Water Supply Networks:
- Implementation of resilient water supply networks, intricately designed to ensure optimal performance.
- Inclusion of highways for efficient access and maintenance.
- Development of headworks with a focus on effective water management.
Pumping Station and Dewatering Systems:
- Construction of a pumping station tailored for efficient water distribution.
- Integration of dewatering systems to manage water levels effectively.
Reservoir and Pressure Tower:
- Development of a detailed reservoir project, incorporating necessary facilities for ventilation and control.
- Consideration of a pressure tower if required to maintain optimal pressure levels.
House Connections and Internal Wiring:
- Establishment of reliable house connections for seamless water distribution within buildings.
- Implementation of internal wiring to facilitate efficient water usage.
Individual Population Metering:
- Installation of individual population meters, ensuring precise monitoring.
- Inclusion of all related facilities for a comprehensive metering system.
Crossing of Natural and Artificial Obstacles:
- Thorough consideration of railway crossings, roads, ravines, rivers, and other natural or artificial obstacles.
- Integration of DMA water meters and pressure relief (PRV) chambers to address specific project needs.
Operational Cost Determination:
- Rigorous analysis and determination of operational costs to provide clear insights for sustainable management.
Preparation of Specifications and Cost Estimates:
- Detailed preparation of specifications and accurate cost estimates to ensure transparency and informed decision-making.
Preparation of Scope of Works:
- Definition and documentation of the scope of works, outlining the tasks and objectives of the project.
Commitment to Excellence
Our dedication extends beyond project completion; we aspire to deliver a water supply system that stands as a testament to efficiency, sustainability, and reliability. We look forward to contributing to the prosperity and well-being of Manglisi and its residents.