BAKURIANI

Water Supply System

🏗️ Bakuriani Water Supply System Optimization Project

Project Overview

Project Cost: 8,500,000.00 GEL
Contractor: Invest Group
Employer: United Water Supply Company of Georgia (UWSCG)
Location: Bakuriani, Georgia

Introduction

Embark on the journey of revitalizing the Bakuriani resort through the Optimization Works of its water supply system. Our project aims to elevate water flow, enhance operational flexibility, and ensure system reliability. With meticulous planning and innovation, we strive to optimize existing infrastructure and introduce new elements to meet the evolving needs of this esteemed destination.

Project Highlights

Location

🏫 City: Bakuriani, Georgia
📍 Geographic Details: Situated in Borjomi municipality, on the northern slope of the Trialeti ridge, on the bank of the Bakurianiskali River, 1700 meters above sea level, and 180 kilometers from Tbilisi.

Project Components

Main Building Rehabilitation or Construction:

    • Upgrade of existing structures or construction of new ones to fortify the core of the resort.

Main Pipe Infrastructure Enhancement:

    • Implementation of advanced main pipe systems for seamless water distribution in newly constructed main buildings.

Sanitary Protection Measures:

    • Installation of protective fences to ensure the integrity and hygiene of the water supply.

Pumping Station Reconstruction:

    • Overhauling the pumping station to improve efficiency and reliability in water circulation.

Reservoir Rehabilitation:

    • Refurbishing existing reservoirs and constructing new ones if deemed essential for optimal water management.

Automatic Control System - SCADA:

  • Deployment of an automatic control system encompassing various elements such as railway, road, ravines, rivers, and other natural or artificial obstacles.
  • Inclusion of rehabilitation measures for existing treated road surfaces.

Water Treatment Plant Upgrade:

    • Enhancing the water treatment facility to elevate performance and ensure water quality.

Ventilation System Maintenance:

    • Regular upkeep of the ventilation system to guarantee a conducive environment for the entire infrastructure.

Trunk Pipeline Establishment:

    • Introducing trunk pipelines for a well-organized and efficient water transportation system.

Switch Nodes and Pipes Integration:

    • Incorporating switch nodes and pipes into existing self-current and pressure mains to enhance overall system functionality.

Energy Efficiency Measures:

    • Implementing supplementary energy solutions such as hydro turbine units to manage excess pressure in the main pipes.

Exploration of Alternative Options:

    • Delving into alternative solutions for additional head construction, reservoirs, or pumping arrangements, supported by rigorous technical and economic studies.

Commitment to Excellence

Our commitment goes beyond the conventional, as we remain open to exploring alternative options that promise superior benefits. Every decision is grounded in a robust technical and economic evaluation, ensuring the sustainability and efficiency of the Bakuriani resort water system. We take pride in our dedication to delivering not just a project, but a lasting solution that aligns with the evolving needs of this esteemed destination.

Project Diversity

"Discover Our Passion for Creating Timeless and Innovative Designs"

Get in Touch

Building Relationships Through Communication

Tbilisi Office
Gori Office